Project Overview

Whites Scaffolding was contacted at short notice by Premier Marinas following a serious fire involving a boat at Portland Marina in Dorset.

The damaged vessel needed to be removed from the marina and transported to a scrapyard, but before it could be moved it first had to be securely encapsulated.

A freestanding independent scaffold was required around the boat to give the team suitable access for full shrink wrap encapsulation.

The call came through on a Friday. Whites Scaffolding needed to be on site the following morning and complete the scaffold, encapsulation and subsequent dismantling within an exceptionally tight timeframe.

The Challenge

The fire had left soot, ash and other debris on and around the damaged vessel.

Before the boat could be transported, it was important to contain this material and reduce the risk of debris affecting neighbouring boats or the surrounding marina environment.

The unusual shape of the vessel also made the access requirement very different from a conventional building scaffold.

The structure needed to:

  • Provide access around the full vessel.
  • Follow the shape and dimensions of the boat.
  • Allow the shrink wrap to be installed effectively.
  • Avoid interfering unnecessarily with surrounding marina activity.
  • Provide sufficient working space for the encapsulation process.
  • Be erected at extremely short notice.

Time was another major factor.

Premier Marinas contacted Whites Scaffolding on the Friday, with the scaffold required for the following morning.

There was effectively no conventional lead time for the project.

The Emergency Response

Whites Scaffolding responded immediately to the call-out.

Our operatives arrived at Portland Marina at 8:00am on Saturday morning, allowing work on the access structure to begin without delay.

The team assessed the vessel and surrounding working area before erecting a freestanding independent scaffold around the boat.

Unlike scaffolding around a rectangular building, the structure had to respond to the changing profile of the hull and superstructure while still leaving enough room for the encapsulation team to work.

Careful positioning of the scaffold was therefore essential.

The Solution

A freestanding independent scaffold was erected around the damaged vessel to provide access for the complete shrink wrap installation.

The scaffold allowed operatives to work around the boat at the heights required without relying on the vessel itself as the primary access system.

Once the access structure was in position, the boat was fully encapsulated using shrink wrap.

The encapsulation created a contained outer covering around the fire-damaged vessel, helping prevent loose soot, ash and debris from escaping during its removal and onward transportation.

The scaffold arrangement also had to leave sufficient clearance for the wrap to be installed continuously around the vessel.

Whites Scaffolding worked around the unusual geometry of the boat while taking neighbouring marina operations into consideration throughout the project.

Why Shrink Wrap Was Important

In this case, shrink wrap was not being used simply for weather protection.

Its principal purpose was containment.

The fire-damaged vessel contained soot, ash and loose debris that needed to remain contained before the boat could be moved from Portland Marina.

Full encapsulation helped create a controlled barrier around the vessel and reduced the possibility of debris contaminating nearby boats or the surrounding area during removal.

This meant the scaffold and shrink wrap needed to work as one access and containment system.

The Result

The entire operation was completed within a 24-hour turnaround.

From receiving the request, Whites Scaffolding mobilised to Portland Marina, erected the freestanding scaffold, enabled the vessel to be fully shrink wrapped and subsequently dismantled the access structure.

The completed encapsulation allowed the damaged boat to be prepared for removal from the marina and transportation to the scrapyard.

Despite the extremely short notice, unusual scaffold geometry and sensitive marina environment, the project was delivered quickly and efficiently.

The job demonstrates Whites Scaffolding’s ability to respond to emergency access requirements where speed, containment and careful coordination are all essential.

Regular Scaffolding Work at Portland Marina

Whites Scaffolding regularly works at Portland Marina, providing scaffold access for marine maintenance and repair projects.

Depending on the vessel and the work being undertaken, scaffold access can support activities including:

  • High-pressure hull cleaning.
  • Boat name changes and exterior finishing.
  • Lift, launch and block-off works.
  • General boat and ship maintenance.
  • Repair work around hulls and superstructures.
  • Mast removal.
  • General rigging work.

Marine scaffolding is different from conventional building access because every vessel presents a different profile.

Hull shape, vessel height, masts, rigging, surrounding boats and the position of the vessel ashore can all influence how the scaffold needs to be configured.

Whites Scaffolding can provide freestanding access structures and encapsulation solutions tailored to the vessel and the work being carried out.

Scaffolding and Encapsulation for Marine Projects

Marine maintenance can require access to areas that are difficult to reach safely from ladders or conventional ground-level equipment.

Whites Scaffolding can provide temporary access for vessels undergoing maintenance, refurbishment, repair or specialist works.

Our marine scaffolding solutions can be planned around:

  • Hull maintenance.
  • Painting and finishing.
  • Cleaning and repair.
  • Rigging and mast work.
  • Vessel refurbishment.
  • Shrink wrap containment.
  • Emergency access requirements.

For marine scaffolding, emergency call-outs or shrink wrap encapsulation, call 01722 398439 to discuss your requirements with Whites Scaffolding.

24 Hours From Call-Out to Completion

From the initial Friday request to erection, encapsulation and final dismantling, the entire Portland Marina project was completed within 24 hours.

Whites Scaffolding responded rapidly, adapted the scaffold to the unusual shape of the fire-damaged vessel and provided the access required to fully contain it before removal from the marina.