Project Overview

We supported Saxon Gate Homes on their new build development in Andover, providing a reliable progressive scaffolding solution that allowed the brickwork team to safely raise external walls to full height. With traditional brick construction, the scaffold had to grow with the build, meaning careful coordination, timely returns and consistent communication. Our team worked closely with the site managers, ensuring every lift was installed, adapted or struck exactly when required.

Scope of Works

We erected a full progressive scaffold system around the property plots, designed to support traditional brick and block construction. Over the three-month period, we returned for multiple visits to raise lifts, add guardrails, reposition access points and ensure the working platforms always matched the pace of the bricklayers. All structures were inspected, signed off and compliant with site safety standards throughout the build.

Challenges and Solutions

  • Ongoing Build Progression: We scheduled phased visits to raise scaffold lifts as the brickwork advanced, ensuring the team always had safe, stable access.
  • Multiple Plots & Changing Requirements: We adapted the scaffold layout as each plot developed, providing new access routes and altered configurations as needed.
  • Busy Building Environment: We coordinated closely with other trades to minimise disruption and maintain safe working zones around the site.

Client Experience

Saxon Gate Homes benefitted from dependable, well-timed scaffolding support that matched the reality of a working new build site. Our team remained responsive throughout the development, arriving promptly for each requested lift adjustment and keeping communication open with the site manager. The scaffold remained neat, tidy and structurally sound over the entire project, giving the bricklayers complete confidence at every stage.

Outcome

The progressive scaffold system enabled the brickwork team to achieve steady, efficient progress over the three-month schedule. Every lift was completed on time, and every adaptation was planned with safety and workflow in mind. Saxon Gate Homes were provided with a professional, compliant and fully managed scaffolding service that contributed to a smooth build programme and safe working environment.